Route 895 Construction - March 2002 - Photos 18-20
Here's 3 photos of Route 895 under construction, taken in March, 2002.
Above, looking down the Laburnum Avenue Extension toward its interchange with Route 895. This photo shows the directional route signing. As you can see, Route 895 is being signed with the Virginia primary route shield.
Above, I'm standing on the Willson Road overpass, looking west onto Route 895. Paving, line painting, and guard rail installation has been completed on this section. The overpass in the distance is VA-5 New Market Road.
Above, I'm standing on the Willson Road overpass, looking east onto Route 895. Paving, line painting, and guard rail installation has been completed on this section.
© Copyright 2002 by Scott Kozel, and all photos taken by same. All rights reserved.
Lead page for Route 895 Construction - March 2002
Lead page for Route 895 Construction
Lead page for Route 895 Connector (Pocahontas Parkway)
By Scott M. Kozel,
Roads to the Future(Created 5-1-2002)