Here are 21 photos of Virginia Route 288 under construction, taken in September, 2004. Click the thumbnail photo for a larger photo (they range in size from 77 to 242 kilobytes, with most being less than 150 kilobytes).
The following 6 photos were taken from Charter Colony Parkway in Chesterfield County.
Route 288 construction, looking south from the Charter Colony Parkway overpass over Route 288. Paving operations are underway on Route 288, and continuously reinforced concrete pavement has been placed in a 10-inch-deep concrete slab. I have details of the concrete pavement design on my webpage Route VA-288 Construction - October 2003. This is in Chesterfield County. | |
Route 288 construction, looking south from the Charter Colony Parkway overpass over Route 288. This photo was taken from the same vantage point as the previous photo, but it was taken with a 135mm (2.7x) telephoto lens, instead of the 50mm (1.0x) regular lens used previously. Paved shoulder construction is about to begin. | |
Route 288 construction, looking south from the Charter Colony Parkway overpass over Route 288. This vantage point is from the opposite side of Route 288 as the two previous two photos. | |
Route 288 construction, looking south from the Charter Colony Parkway overpass over Route 288. This photo was taken from the same vantage point as the previous photo, but it was taken with a 135mm (2.7x) telephoto lens, instead of the 50mm (1.0x) regular lens used previously. | |
Looking north from where Charter Colony Parkway crosses Route 288. Paving operations are underway on Route 288, and continuously reinforced concrete pavement has been placed in a 10-inch-deep concrete slab. Paved shoulder construction is about to begin. | |
Looking north from where Charter Colony Parkway crosses Route 288. This photo was taken from the same vantage point as the previous photo, but it was taken with a 135mm (2.7x) telephoto lens, instead of the 50mm (1.0x) regular lens used previously. The interchange and overpass for Woolridge Road is visible in the distance. |
The following 15 photos were taken from an early September drive of the new section of Route 288 that opened to traffic on August 27th, the 6.7 miles of Route 288 between US-60 Midlothian Turnpike in Chesterfield County and VA-6 Patterson Avenue in Goochland County, including the Route 288 James River bridge.
Lead article for Route VA-288 Construction - Western Section
All photos taken by Scott Kozel.
Copyright © 2004 by Scott Kozel. All rights reserved. Reproduction, reuse, or distribution without permission is prohibited.
By Scott M. Kozel, Roads to the Future
(Created 11-1-2004, updated 12-1-2004)